High-grade polymetallic (Cu, Zn, Pb, Ag, and Au) project located southeast of the Antofagasta region (3,100 meters above sea level).


Feasibility completed

The project is in the feasibility stage, which was completed in July 2021 with attractive economic results:

  • NPV: US$162mm
  • IRR: 25%
  • LOM: 16 years
 

Resources

  • Over 40,000 meters of DDH (diamond drill hole) drilling have been carried out.
  • The project has NI 43-101 resources of 10.1 MT @ 2.98% CuEq.
 

Multiple development alternatives

  • The project has significant exploration upside that could double the existing resources..
  • There are multiple options for its development.
  • This allows to benefit from exposure to different commodities
 

ESG

  • Development of underground mining with minimal environmental impact
  • The project is located in an area without population and without communities.
  • The EIA (Environmental Impact Assessment) to be submitted soon will include the use of wastewater in its production process.